Civils & Strengthening Services Featuring NexGen2 Blind Bolt Technology

Strengthening Australia’s Mobile Network Starts from the Ground Up

At AM2PM Group, we specialise in civil works and structural strengthening for telecommunications infrastructure. Our work ensures Australia’s mobile network stays strong, compliant and ready for the demands of 4G, 5G and future technologies.

From monopole reinforcement and steel replacement to advanced blind bolting systems and corrosion remediation, AM2PM delivers the full scope of strengthening required to safely upgrade towers and extend the life of critical assets. Our team works closely with major carriers, network partners and engineering firms to complete complex strengthening projects efficiently, safely and with minimal disruption to the network.

Every tower we strengthen directly improves the performance, safety and reliability of the networks millions of Australians rely on every day.

Call to action: Request a Civils and Strengthening Quote.

Why Strengthening Matters in Modern Telecommunications

Telecommunications structures face increasing demands. New carrier equipment, additional load from 5G technology, ageing assets and environmental exposure all contribute to declining structural integrity over time.

A strengthening program delivered by AM2PM protects assets and ensures:

  • Safe load-bearing capacity for modern hardware
  • Full compliance with engineering and carrier requirements
  • Reduced risk of structural failure or network downtime
  • Longer service life with fewer future repairs
  • Faster upgrade readiness for future network rollouts

Whether adding new equipment or extending the life of existing infrastructure, strengthening is an essential part of keeping mobile networks safe and operational for years to come.

Our Civils and Structural Strengthening Process

AM2PM delivers a complete strengthening process from assessment to installation.

1 | Site Assessment and Engineering Review

We assess the tower, monopole, or structure alongside engineering specifications and carrier requirements. This identifies the reinforcement, remediation or upgrades needed.

2 | Civil Works and Site Preparation

Before any strengthening at height begins, our civil team prepares the site safely and efficiently. This includes ground works, access, steel handling and equipment staging.

3 | Structural Reinforcement and Steel Installation

We complete the strengthening scope, including bracing, C channel installation, structural steel upgrades, replacement of compromised components and reinforcement plates.

4 | Blind Bolting and Fastener Installation (NexGen2)

AM2PM is nationally recognised for our use of the NexGen2 Structural Blind Bolt Assembly. This system is ideal for towers and monopoles and allows one sided installation without cranes.

5 | Corrosion Remediation and Rust Prevention

We clean, treat and protect steel surfaces to prevent further deterioration and ensure the structure remains compliant and sound.

6 | Final QA and Handover Documentation

All strengthening work is checked against engineering and carrier specifications. We provide final documentation, photos, and sign off for compliance and future asset records.

What We Deliver

Monopole and Tower Strengthening

  • C channel reinforcement up to tower heights
  • Strengthening for new equipment loads
  • Steel replacement and remediation
  • Carrier-approved strengthening for Telstra, Optus, TPG, and OEM partners

Blind Bolting Solutions (NexGen2)

  • One-sided bolting for restricted or high-access environments
  • Installed without cranes
  • High-strength and corrosion-resistant fasteners
  • Proven results across multiple AM2PM strengthening projects

Tower Maintenance and Remediation

  • Steel refurbishment and surface repairs
  • Rust control and long-term corrosion protection
  • Removal of redundant hardware
  • Scheduled maintenance for carrier-owned sites

Telecommunications Civil Works

  • Site access and ground preparation
  • Trenching, excavation, and foundation improvements
  • Steel handling and civil support for upgrade works
  • Full logistics integration across civil and height-based scopes

Project Case Study: Newcastle Telecommunications Monopole Strengthening

AM2PM completed a full strengthening program for a telecommunications monopole in Belmont South, NSW. The project highlighted the team’s engineered methods and crane-free installation capability. 

(First contactors to use this specific bolt in Australia, AM2PM understands systems are evolving and is eager to implement new solutions to the industry)  

Scope included:

  • C-channel bracing installed on the monopole
  • More than 450 NexGen2 blind bolts installed at height
  • Replacement and strengthening of damaged steel sections
  • Rust control and corrosion prevention coatings applied

Project outcome:

  • Completed one week ahead of schedule
  • Delivered under budget
  • Zero crane use due to specialised access systems
  • Led to additional strengthening projects with Telstra and Optus

Technical details and photos are available on our blog: Phone Tower Maintenance With NexGen2

Where We Work

AM2PM provides civils and strengthening services across:

  • Sydney Metro
  • Newcastle and Central Coast
  • Regional NSW
  • ACT
  • Queensland
  • Victoria

Our logistics capability allows fast mobilisation into metropolitan, regional, and remote sites.

Why Clients Choose AM2PM for Civils and Strengthening

  • Strong track record working with Australia’s major carriers
  • Industry-leading expertise in blind bolting and tower reinforcement
  • In-house civil, steel, and height access specialists
  • Fast mobilisation and efficient project delivery
  • Safe, compliant, and engineered strengthening solutions
  • Complete service capability including civil works, logistics, and installation

Our focus is on making towers safer, stronger, and ready for future technologies with a standard of workmanship that meets the expectations of the telecommunications industry.

Frequently Asked Questions

Do you strengthen towers for all carriers?
Yes. We regularly complete strengthening projects for Telstra, Optus, TPG and national infrastructure partners.

Can reinforcement be completed without cranes?
Yes. Our specialised access systems and the NexGen2 bolting platform allow most strengthening work to be completed without cranes.

Do you complete both civil and structural scopes?
Yes. AM2PM manages the civil, steel and installation components in house.

What types of structures do you strengthen?
Monopoles, lattice towers, rooftop structures and carrier specific asset types.

Do you work in regional areas?
Yes. Our logistics team regularly deploys into regional and remote locations.

Read on to learn more about our civils/strengthening projects: